GRC bathroom pods for project delivery
Build the room before it reaches site.
SALLY turns repeatable bathroom types into a coordinated GRC pod brief for EPC and D&C projects.
Drawings first. Scope made clear. Evidence open to review.
SALLY at a glance
Bathroom systems built for repeatable project delivery.
SALLY has worked in prefabricated bathroom systems since 1999. Its range covers GRC bathroom pods, SMC systems, VCM finishes, PU waterproof bases and bathroom components.
For project teams, the starting point is a room type, not a catalogue shortcut. Drawings, finishes, service interfaces and final inclusions are reviewed against the project brief before repeat production.
Current company records trace SALLY's operation to 1999.
Resolve the interfaces while the room is still a drawing.
The current range brings together a GRC base, a panelised enclosure and a factory-fitted bathroom interior. Final composition, services and responsibilities follow the project drawings.
Final inclusions are confirmed project by project.
- 01GRC base
- 02Panelised enclosure
- 03Factory-fitted interior
- 04Project-specific interfaces
Built for repetition. Finished for the room.
The system starts with a repeatable room brief, then follows the finish schedule and interface decisions for the project.
Apartments & BTR
Consistent bathroom types across residential towers and repeatable floorplates.
View application
Hotels & resorts
Room packages shaped around the operator's standard and project finish schedule.
View application
PBSA & workforce
Durable, repeatable layouts for accommodation programmes with recurring rooms.
View application
Accessible layouts
Client sample configurations with visible support and circulation features. Compliance remains project-specific.
View applicationIllustrative settings with client-supplied sample configurations. Not Australian project case studies.
Project archive
Projects across sectors and regions.
Nineteen client-supplied references from SALLY's bathroom systems brochure, presented without added scope or performance claims.
Client-supplied project references. Project scope and current status have not been independently verified.
Start with the drawing, not the catalogue.
Room information comes first. The sequence then moves through technical review, a project sample, agreed manufacturing scope and defined site responsibilities.
-
Brief
Room types, quantity, location and programme.
-
Technical review
Drawings, services, interfaces and constraints.
-
Sample
A project reference before repeat production.
-
Manufacture
Production against the agreed scope.
-
Logistics
Packing and route planning for the project.
-
Site assembly
Defined handover and installation responsibilities.
Certification record
International management system certification record.
SALLY supplied certification records for quality, environmental and occupational health and safety management systems.
| Standard | Management system and certificate record |
|---|---|
| ISO 9001Quality management | Certificate 11423Q45984R3MValid through 26 August 2026 |
| ISO 14001Environmental management | Certificate USA23E42815R3MValid through 26 August 2026 |
| ISO 45001Occupational health and safety management | Certificate 11423S25985R3MValid through 26 August 2026 |
Repeatability starts before production.
Drawings, sample alignment, manufacturing controls and site interfaces turn a room type into a repeatable product brief.
- Drawing review
- Sample alignment
- Manufacturing controls
- Site interface planning
Put a real project on the table.
Share the location, stage, room count and the information already available. We will start with the brief.